翻訳と辞書
Words near each other
・ Velichovky
・ Velidhoo
・ Velidhoo (Noonu Atoll)
・ Velie
・ Velie Memorial Cup
・ Velie Monocoupe
・ Velie Nunatak
・ Veliefendi Race Course
・ Velifer hypselopterus
・ Veliferidae
・ Velificatio
・ Veligallu Dam Reservoir
・ Veligandla
・ Veligandu
・ Veliger
Veligonda Project
・ Veligosti
・ Velihimmetli, Gölbaşı
・ Veliidae
・ Velija Bećirspahić
・ Velijašnica
・ Velije
・ Velik Kapsazov
・ Velika
・ Velika attacks (1879)
・ Velika Barna
・ Velika Begovica
・ Velika Biljanica
・ Velika Braina
・ Velika Brda


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Veligonda Project : ウィキペディア英語版
Veligonda Project

Veligonda Project is an under construction irrigation project located in Prakasam district in Andhra Pradesh, India.〔(【引用サイトリンク】title=Andhra Pradesh / Ongole News : Project details )〕 When completed, the project will provide irrigational facilities to 459,000 Acres and drinking water to 1.5 million people in 29 Mandals of fluorine and drought affected areas in Prakasam district, Nellore district and Kadapa district by diverting 43.5 TMC of floodwater of Krishna River from foreshore of Srisailam Reservoir near Kollamvagu and proposed to store in Nallamalasagar Reservoir.
The water for the project is drawn through two 18.8 km long tunnels across Nallamala hills. The project has been renamed to Poola Subbaiah irrigation project.〔(【引用サイトリンク】title=Andhra Pradesh / `Velugonda' to be named after Poola Subbaiah )〕〔(【引用サイトリンク】title=The Hindu: Work on Veligonda project resumes )
The construction includes two parallel tunnels of 18.8 km with 9.2 m and 7 m internal diameter and 21.6 km Flood flow canal for the water transmission system linking with Srisailam Reservoir up to Guntur-Kurnool road. The project is being implemented by double shielded tunnel boring machine to make the tunnel without disturbing wildlife in the Nagarjunsagar-Srisailam Tiger Reserve.
==Status of progress of the project==

* As of May 2015, 12.6 km of tunnel digging had been completed for the first tunnel, and 8.1km had been completed for the second tunnel.
* Only a little progress has been made in the past few years by contractors citing the equipment problems and payment issues with government.
* First phase of the project to be completed by September 2016.〔(【引用サイトリンク】title= 1st Phase is expected to be complete by September 2016 )

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Veligonda Project」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.